Scheduling, Estimation & Modelling Of G+14 Structure



EOI: 10.11242/viva-tech.01.05.120

Download Full Text here



Citation

Ms. Shubham Chavan, Ms. Prabhat Chavan, Ms. Pruthviraj Kamble, Ganesh Godhke, "Scheduling, Estimation & Modelling Of G+14 Structure ", VIVA-IJRI Volume 1, Issue 5, Article 120, pp. 1-4, 2022. Published by Computer Engineering Department, VIVA Institute of Technology, Virar, India.

Abstract

The Construction Industry all over the globe is at its prime. Every year with every project executed a new benchmark is set up. The project must be planned properly followed with scheduling and estimation. Traditional methods adopted for the construction can do very little to help with the cause. This has to be resisted with proper use of software's construction tools to contain the overall time required to complete the project. Such are the cases when high end software comes in handy. The success of any project lies in the efficient management of time, quality and cost. Any construction project to begin with starts with the Layout of the building or structure followed by Design and Analysis of the structure which is succeeded by cost estimation and planning for the said project. This project involves the layout, design, analysis, planning and cost estimation of G+14 residential building.

Keywords

Scheduling, Estimation, Construction, Management of time, Layout, Design, Planning

References

  1. Building cost Information Service: Standard form of cost analysis, principles, instruction and definition, the building cost information service, UK, 1999
  2. Divyakmath, K.Vandana Reddy, Analysis and design of reinforced concrete structures-A G+14 building model, miniproject report, Gokaraj Rangaraju Institue of Engineering and Technology, Hyderbad, India, 2012
  3. M. AradhanaRao, P. Mohanrao, Y.Sombabu, A Case Study on Estimation and Costing of Multi-Storey Building, International Journal of Advanced Research in Science, Engineering and Technology, 2019
  4. Michael C. Forde, Construstion And Building Materials, The University of Edinburgh, Institute for Infrastructure and Environment, School of Engineering, Edinburgh, United Kingdom
  5. Gwang-Hee Kim, Journal of Building Construction and Planning Research: A New Platform for Building Researchers, Department of Plant & Architectural Engineering, Kyonggi University, Suwon-Si, South Korea, 2013.
  6. S. Laddha, P. Chanda and S. Khandekar, Planning and Scheduling of a project using Microsoft Project (MSP), International Journal of Advanced Reasearch (IJAR), 2017
  7. P M Wale1, N D. Jain, N R Godhani2, S R Beniwal, Planning and Scheduling of Project using Microsoft Project, Volume 12, Issue 3 Ver. III (May. - Jun. 2015)
  8. UnmeshY.Polkar, Rohit.R.Salgude (2015), Planning, Scheduling and Tracking of a Residential Project using Primavera Software, International Journal of Advance Research In Computer Science and Management Studies,Vol 3,Issue 5(MAY 2015) ISSN:2321-7782
  9. ThrRhuta Joshi, Prof. V. Z. Patil, Resource Scheduling of Construction Project, Case Study 4.438 Volume 4 Issue 5, May 2015
  10. Abhishek sharma,and K.K.pathak, Manpower Planning, Scheduling and Tracking of a Construction Project Using Microsoft Project Software.
  11. P Raghunath Reddy, Planning and Resource Scheduling of Residential (G+14) International Journal of Innovative Research in Science, Engineering and Technology (An ISO 3297: 2007 Certified Organization) Vol. 5, Issue 10, October 2016
  12. ShivaniSakre ,Abhijit .N. B, Planning and Scheduling in Construction through Model Approach, International Journal on Recent and Innovation Trends in Computing and Volume: 3,Issue: 5, (MAY 2105),ISSN: 2321-8169
  13. C. Chowdeswari, D. S. Chandra and S. Asadi, Optimal Planning and Scheduling of High RIse Buildings, International Journal of Civil Engineering and Technology (IJCIET), vol. VIII, no. 1, pp. 312-324, 2017
  14. Satinder Chopra, Arvind Dewangan, Developing an Efficient Schedule in Microsoft Project : Significance of Activity ID & Descriptions, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 3, Issue 7 (July 2014) ISSN: 2319-8753